TTE® Construction Principle 1 - car parks up to a weight of 3.5 t

Please contact us for a reference list for your postal code area.
See for yourself in your locality the function of the TTE® construction principle.

 

 

Outside facilities of a commercial property - NL

Outside facilities of a commercial property - NL

Outside facilities of a commercial property - NL

Special features: nature conservation area

Foot and bicycle path in Beeskow - DE

Mountain road - CH

Mountain road- CH

TTE® Construction Principle 2 - car parks and occasional heavy goods traffic

Please request a reference list for your postal code area without obligation at Contact.
See for yourself in your locality the function of the TTE®-construction principle.

G3 Shopping Resort Gerasdorf - AT

Aufnahmen Dezember 2013

G3 Shopping Resort Gerasdorf - AT

G3 Shopping Resort Gerasdorf - AT

Aufnahmen August 2013

Aufnahmen Mai 2015

Hotel car park, Neustrelitz - DE

Hotel car park, Neustrelitz - DE

Project data

Project size: ca. 1000 m2

Build in: 2014

TTE® Construction Principle: Construction principle 2

Parking lot at the airport Bern - CH
build-up steps

Parking lot at the airport Bern - CH build-up steps
Removal of turf; delivery of gravel base course material
Removal of turf; delivery of gravel
Application and distribution of the gravel sand mixture
base course material
Rolling on the gravel sand into the top soil
Application and distribution of the
Creation of the terrain modeling and rough grading
gravel sand mixture
Applying and levelling of the bedding (grit-top soil-mixture)
Rolling on the gravel sand into the top
Laying of elements on the fine network
soil
Inserting the TTE® paving stones as a parking place marking and footpath
Creation of the terrain modeling and
Introduction of the substrate (top soil- sand-mixture) as a chamber filling
rough grading
Protection of the vegetation by using higher webs
Applying and levelling of the bedding

Parking area / TTE® as root protection for tree plantations - FR

Parking area / TTE® as root protection for tree plantations - FR

fire rescue path

fire rescue path for a school

University forecourt Kopenhagen DK

University forecourt Kopenhagen DK

Project data

Project size: ca. 2000 m2

Build in: 2013

TTE® Construction Principle: Construction principle 2

Parking area / Lay-by areas - AZ

Side and useful areas – residential estate in Tankefuld DK

Side and useful areas – residential estate in Tankefuld DK

Project data

Project size: ca. 1600 m2

Build in: 2013

TTE® Construction Principle: Construction Principle 2 with vegetation capability

Special feature: Surface pretreatment of rain water

Puplic parking area - media library FR

Puplic parking area - media library FR

Project data

Project size: ca. 2300 m2

Build in: 2012

TTE® Construction Principle: Construction Principle 2

Special feature Full dewatering of the reinforced surface over the TTE®-system

Parking area in a swamp area in Worpswede - DE

Project data

Project size: ca. 1000 m2

Build in: 2009

TTE® Construction Principle: Construction Principle 2

Special feature: Parking places in a swamp area

Greened access road - NL

Greened access road - NL

TTE®-Construction Principle 3 - For heavy goods traffic up to 40 t

Please request a reference list for your postal code area without obligation at Contact. See for yourself in your locality the function of the TTE®-construction principle.

Residential streets in Wittenberg

Aufnahmen August 2015

 
 

Residential streets in Wittenberg

Residential streets in Wittenberg

Project data

Project size: ca. 2000 m2

Build in: 2013

TTE® Construction Principle: Construction Principle 3

Aufnahmen Juni 2014

Aufnahmen November 2014

Port entrance in Würzburg

Port entrance in Würzburg

Project data

Construction Principle: TTE® construction Principle 3

Housing development in Denmark

Housing development in Denmark

Industrial site company Herzig

Commercially used courtyard fortification 

Project data

Project size: 800 m2

Build in: 2013

TTE® Construction Principle: Construction Principle 3